Derail Valley – Mega 2000-Ton Train Build & Shunting Challenge at the Harbor EP 48
Welcome back to Derail Valley with DarthVegan! 🚂 In this episode, we tackle an ambitious logistics challenge — assembling a massive 2000-ton freight train in the Harbor using two DE6s and a DH4 for shunting. From choosing the best-paying jobs to navigating tight yard maneuvers, it's a shunting-heavy day full of tight turns, explosive ammonium nitrate, and classic Derail Valley physics fun!
💥 Will everything fit? Can we avoid derailing the plan (or the train)? And how much cash will this beastly cargo haul bring in?
📍 Key Locations in This Episode:
Harbor Yard planning & weather update ☁ ️
Prioritizing jobs to the Farm, Steel Mill, and Goods Factory
Shunting chaos in the D, E, and G yards
Connecting hazardous materials and cryo-oxygen cars
Final assembly of a 1280-meter long freight monster
🛠 ️ Locomotives Used:
DE6 x2 (Double-headed for maximum traction)
DH4 for intricate yard work
Slug unit for extra grip
🧩 This is the ultimate prep episode before the big haul. Join me as we push the limits of Derail Valley's yard logistics!
📅 Next Episode: We finally hit the rails and deliver this monster load across the valley. Don't miss it!
👍 If you enjoy train simulators, logistics planning, or just chill sim content — hit like and subscribe!
🔔 Turn on notifications so you don't miss the delivery run in the next episode!
⏱ ️ Chapters:
00:00 – Intro & Rainy Harbor Day
01:00 – Job Selection: Farm, Goods Factory, Steel Mill
02:30 – Calculating Total Tonnage (~2000 tons!)
03:30 – Shunting Strategy & Car Order Planning
05:00 – Hooking Up Empty Cars for City West
06:30 – Shunting with the DH4 Begins
07:00 – Checking DE6 Hauling Capacity
08:00 – Considering a Military Job Add-On
09:00 – Shunting Ammonium Nitrate from E70
10:15 – Planning the Farm Drop-Off Order
11:00 – Space Concerns & Yard Access Problems
12:10 – Preparing to Move D30 to E11
13:30 – Navigating a Crowded Yard
15:00 – Realizing the Maneuver Won’t Fit
16:00 – Route Change: Through G Yard Instead
17:00 – Threading the Needle: E Yard Entry
18:45 – Final Yard Switches & Tight Margins
20:00 – Hooking Up the Goods Factory Load
21:00 – More G Yard Loads: G7S, G2S, G1S
22:30 – Fuel Burn Warning: DH4 is Thirsty!
23:00 – Final Loads Assembled
25:00 – Bringing It All Together in the E Yard
26:45 – Train Length Confirmed: 1280 Meters
27:30 – Expected Payout Estimation
28:30 – Final Shunting: Cryo Oxygen to Steel Mill
30:00 – All Cars Hooked Up – Final Adjustments
31:30 – DH4 Shutdown & Wrap-Up
32:00 – Outro: Next Time We Haul It All!
Derail Valley Playlist: • Derail Valley | Train Simulation
#DerailValley #SteamLocomotive #TrainSimulator #SteamEngineTutorial #Darthvegan #ShuntingGameplay #TrainSim
Become a Member to gain access to peran
Join my Discord servhttps://discord.gg/bTm37YFpdhrd
Watch my Twitch streahttps://www.twitch.tv/darthveganytyt