First layer of Bondo in place

Channel:
Subscribers:
1,740
Published on ● Video Link: https://www.youtube.com/watch?v=6LapwOjo9Tk



Duration: 1:04
364 views
0


I've got the first layer of Bondo on the cabinet. It's pretty much a sure thing that it'll need another application or two. The first layer gets most of the low spots, but I always seem to find something that I missed, or a piece will come off while sanding due to some soft wood that didn't come off when I was preparing the edges.







Tags:
Centipede
arcade
bondo
restoration