The Lost Pikcraft Episode 13 Pikmin Plushtime Impact Site Build

Channel:
Subscribers:
2,210
Published on ● Video Link: https://www.youtube.com/watch?v=89bcbZnVuHY



Game:
Pikmin (2001)
Duration: 6:37
932 views
16


Pikmin Plush Time created the Impact Site from Pikmin 1 and has invited me to check it out. This is amazing creative Minecraft build.

Check out Pikmin Plush Time's videos (including a live stream build video of this world).
https://www.youtube.com/channel/UCckqSIK3XJUbpXxDGowWcGw

What is The Lost Pikcraft series?
The Lost Pikcraft is a Minecraft survival server made up of people on the The Lost Pikmin Discord server. I record videos of my travels in that survival world (inspired by Hermitcraft). Since the discord is Pikmin themed, the videos use a Pikmin soundtrack.







Other Statistics

Pikmin Statistics For wolfbe7

wolfbe7 presently has 15,544 views for Pikmin across 27 videos, and about 5 hours worth of Pikmin videos were uploaded to his channel. This makes up 3.47% of the content that wolfbe7 has uploaded to YouTube.