Callum Makes a Hash of it - Leyland Tiger Part 2

Channel:
Subscribers:
9,040
Published on ● Video Link: https://www.youtube.com/watch?v=q-rMvQ-FGiQ



Duration: 12:35
359 views
9


In this part we have removed the floor with as much grace as a drunk lamb, However here we are preparing the metal for any welding that is needed and looking at if any needs replacing.

In the middle of the video, I begin some welding on the coach but not on camera. As the coach is standing currently my own B10 has taken priority as the coach moves and my B10 is stuck in the current place. However, the coach has the outline completed but there is a small teething issue thanks to the size of the metal that Shaun ordered but I will explain this further in Part 3.

After a long wait, the second part of the Leyland Tiger is here. After the removal of the floor and some holes filled it was time to prepare the metal frame that was left to be welded to and painted where needed before the floor could go back down.

Support our channel on:
Patreon
https://www.patreon.com/Mancbuses
YouTube
https://www.youtube.com/channel/UC_t68dWWuCsDjI2W8fjKAog/join

Join our Discord - https://mancbuses.com/discord

Consider Donating to Our Project:- https://mancbuses.com/donate

I have started some new merchandising products:-
https://mancbuses.com/merch

Website
https://mancbuses.com/

Email
Admin@mancbuses.com

#MancBuses #busdrivinglegends







Tags:
Manchester
Driver
Drive
Bus
Drivers
Information
Blog
Help
Mancbuses
Thejmr
V176ESL
Leyland
Tiger
Leyland tiger
weld
chassis
metal
work
contracted
grinding
preparing
National Express
TDTT
town and district transport trust
sparks
team work
Part 2