
How to build & Install Petrol Pump in Lahore Division? Easy and Good business.....
Petrol Filling Stations
Building Plan of CNG / Petrol Filling Station will be approved considering the following requirements:
a) A minimum of 20 ft (6.1m) building line shall be provided.
b) All structures shall be single storey.
c) A clear space of 5ft (1.52m) shall be provided on both sides and at the rear.
d) Turning angle for Entry / Exit points from the adjoining road shall be less than 45 degree.
e) Access shall be limited to only one exit and one entry.
f) The minimum requirements will be as follows:
Min. Area = 1-1/2 K
Min. ROW = 80’
Min. Front = 70’
LDA BUIDLING AND ZONNING REGULATIONS 2019 (with all amendments approved till 28-01-2020)
Note: (1) All requirements of Ministry of Industries, Ministry of Petroleum, Civil Defence Department, Explosives Department, EPA and any other concerned agencies shall be complied with by the builder.
(2) Permission under land use rules will be compulsory from LDA. However, the building plan of CNG/petrol filling stations will be approved by explosive department as per High Court Decision ICA No. 79 of 2009 dated 04-06-2009
#petrolpump