Need for Speed Most Wanted 2012 Critical Path SPEED RUN 260.4 km/h

Channel:
Subscribers:
3,610
Published on ● Video Link: https://www.youtube.com/watch?v=F1TSzwakOw8



Duration: 2:21
521 views
8


Car Used: Lamborghini Aventador J
Event: Critical Path
Average Speed: 260.4 km/h
Actually,it's not perfect.WIth the damn traffic block the perfect route,it can still be improved.Maybe 261kmh?
Enjoy!




Other Videos By Palinden


2013-03-09Need for Speed Hot Pursuit The Hunted 3:18.47
2013-03-09Need for Speed Hot Pursuit 2010 Redline Racing 8:03.88
2013-03-09Need for Speed Hot Pursuit 2010 Rocket Science 2:20.36
2013-03-02Need for Speed Hot Pursuit 2010 Pushing The Envelope 3:04.92
2013-02-24Need for Speed Hot Pursuit 2010 One Step Ahead 4:42.87
2013-02-22Need for Speed Hot Pursuit 2010 Fast Track 1:39.95
2013-02-21Need for Speed Hot Pursuit 2010 Breaking Point 3:35.46
2013-02-20Need for Speed Hot Pursuit 2010 Coast To Coast (Online) 3:40.31
2013-02-17Need for Speed Hot Pursuit 2010 Awe Inspired 2:10.71
2013-02-12Need for Speed Hot Pursuit 2010 Wing And A Prayer(PC) 3:53.12
2013-02-11Need for Speed Most Wanted 2012 Critical Path SPEED RUN 260.4 km/h
2013-02-10Need for Speed The Run Avalanche Race(Summit,Independence Pass)(Bugatti Veyron Super Sport)
2013-02-08Need for Speed The Run Avalanche Race(Summit, Independence Pass)(Mclaren F1)
2013-02-05Need for Speed Hot Pursuit 2010 Elements Of Speed(PC) 2:22.81
2013-02-04Need for Speed Hot Pursuit 2010 Spirit Of Performance 1:45.91
2013-02-04Need for Speed Hot Pursuit 2010 Power Trip 1:58.83
2013-02-03Need for Speed Hot Pursuit 2010 M Power 2:21.88
2013-02-02Need for Speed Most Wanted 2012 Straight To The Point 1:00.96
2013-02-01Need for Speed Most Wanted 2012 Downtown Run Speed Run 302.2 kmh / 187.8 mph
2013-01-31Need for Speed Hot Pursuit 2010 Swedish Swoop 2:32.86
2013-01-29Need for Speed Most Wanted 2012 Needle Point 311.8 kmh /193.7mph(no bug) Koenigsegg Agera R



Tags:
Need for Speed
Most Wanted 2012
Critical Path
Lamborghini Aventador J



Other Statistics

Need for Speed: Most Wanted Statistics For Palinden

There are 6,134 views in 11 videos for Need for Speed: Most Wanted. His channel published less than an hour of Need for Speed: Most Wanted content, or 1.93% of the total watchable video on Palinden's YouTube channel.