POV: You're 12 seconds behind schedule (Top Gun Maverick x Ace Combat 7)
Channel:
Subscribers:
463
Published on ● Video Link: https://www.youtube.com/watch?v=VOQX9NfRdog
Don't think. Just do. And if you think you can do this too, I was using the Skies Rebalanced mod
(https://www.nexusmods.com/acecombat7skiesunknown/mods/1400),
which introduces some serious inertia to your plane that makes flying balls to the wall in the canyon ten times harder
Other Videos By DCHOU
2022-06-05 | POV: You're 12 seconds behind schedule (Top Gun Maverick x Ace Combat 7) |
2022-03-05 | Magic Spear Special Raid (Mod by ElectronicOldMen) |
2022-02-12 | Gravity |
2021-11-26 | Ace Combat 7: Skies Unknown | Aces of Selatapura Launch Trailer |
Other Statistics
Ace Combat 7: Skies Unknown Statistics For DCHOU
At present, DCHOU has 872,482 views spread across 4 videos for Ace Combat 7: Skies Unknown, and less than an hour worth of Ace Combat 7: Skies Unknown videos were uploaded to his channel. This is 100.00% of the total watchable video on DCHOU's YouTube channel.