Project for road between two bridges initially estimated to be built in 2022 to resume late April
Channel:
Subscribers:
124,000
Published on ● Video Link: https://www.youtube.com/watch?v=8wbDvnofQI8
The delayed Picardy-Perkins Connector/Mall of Louisiana Blvd. project is expected to resume construction in the coming months. Residents in the Wimbledon Estates neighborhood are excited for the project to resume and for the roads to two bridges to be completed.
First aired 1/9/25
Read more here: https://www.wbrz.com/news/project-for-road-between-two-bridges-initially-estimated-to-be-built-in-2022-to-resume-late-april
Subscribe to our YouTube channel: / @wbrz
Stream live newscasts all day on WBRZ+: https://www.wbrz.com/news/live-watch-wbrz-streaming-live-on-tv-in-baton-rouge-and-shreveport/
Facebook: https://www.facebook.com/WBRZNews2
Follow WBRZ on Twitter: https://twitter.com/WBRZ