Symmetra Rework Breakdown

Symmetra Rework Breakdown

Subscribers:
5,390
Published on ● Video Link: https://www.youtube.com/watch?v=5iqOGWSS7r4



Overwatch 2 (formerly Overwatch)
Game:
Duration: 6:54
2,729 views
67


In THIS video I'll address the rework ideas Blizzard is iterating on internally.

In the other video I released earlier I went over changes that could have been made without drastically altering the play style of Symmetra.

Regardless, I'm looking forward to the changes they're teasing: they look fun.

Feel free to subscribe if you're interested in hearing me talk more about Overwatch and other games that catch my attention in the future (soon!)







Tags:
Overwatch
Symmetra
changes
rework
ultimate
ult
ultimates
games
gaming
esports
builder
architect
teleporter
shield generator
SG
TP
Photon Shield
shield
shields
sentries
sentry
sentry turrets
turrets
cooldowns
cooldown
Genji
Pharah
McCree
Tracer
Soldier: 76
Sombra
Doomfist
Reaper
hero
heroes
Junkrat
Hanzo
Widowmaker
Torjorn
Mei
Bastion
Winston
D.Va
Zarya
Reinhardt
Orisa
Roadhog
omnic
omnics
robots
Mercy
Ana
Lucio
Zenyatta
Moira
Brigitte
support
tank
offense
defense
abilities
ability



Other Statistics

Overwatch 2 Statistics For Backward Rocket Studios

Backward Rocket Studios presently has 15,789 views for Overwatch 2 across 5 videos, with the game making up 1 hour of published video on his channel. This is 2.02% of the total watchable video for Overwatch 2 on Backward Rocket Studios's YouTube channel.