Welland Ship Canal - Lock 4, Bridge 6 - Part 3 of 5 - I can't wait no more I need some more power
Channel:
Subscribers:
1,070
Published on ● Video Link: https://www.youtube.com/watch?v=c5qUwtfISYo
The only action I'm getting here is the ships, bridges, and locks. But again I know everything is set for them to start heading this way. Lock 4W is lowering again for the next ship making his way from Lock 3. The Seaway doesn't like waiting so the fact that the bridge is down I imagine the arrival of both 421 and 422 is moments away.
The Mavic Mini has some incredible flight time. But as impatient as railfans get, unfortunately batteries lose it as well. Had I come down just a bit earlier it would have been perfect timing. But being a NASCAR drone pit crew was not what I had in mind. Hope you enjoyed the prelude if your a railfan, things are about to pick up next 2 parts.