1 HP IHC Mogul Throttle Governed Engine Rebuild Restoration, Part 4. Putting It All Back Together.

Subscribers:
12,300
Published on ● Video Link: https://www.youtube.com/watch?v=A2FA14TnUco



Duration: 44:20
1,900 views
95


This is Part 4 of a rebuild/ restoration of a 1 HP Mogul throttle governed gas engine. Putting it back together and seeing if the new piston works?




Other Videos By Penny's Hot Rods & Customs


2022-03-153/8 Scale Model Baker Monitor Ball Hopper Engine.Part 4 Machining The Flywheel Pulley.Hit Miss Model
2022-03-121952 Studebaker 2R5 1/2 Ton, Welding in The Cab Corner. Using a Port A Power. Dakota Swap.
2022-03-081952 Studebaker 2R5 1/2 Ton, Hand Made Cab Corner. Sheet Metal Fabrication. Dakota Swap.
2022-03-05Henry J Gasser Radius Rear Wheel Wells, For Fat Meets. 327 4 Speed.
2022-03-023/8 Scale Model Baker Monitor Ball Hopper Engine. Part 3 Boring Out The Cylinder. Hit Miss Engine
2022-02-263/8 Scale Model Baker Monitor Ball Hopper Engine. Part 2 Machining The Flywheels.
2022-02-221952 Studebaker 2R5 1/2 Ton. Fabricating Custom Steering Linkage.
2022-02-203/8 Scale Model Baker Monitor Ball Hopper Engine. Fabricating a 1 Piece Crank.
2022-02-121952 Studebaker 2R5 1/2 Ton Rocker Replacement. Hot Rod Truck. Dakota Frame Swap.
2022-02-081952 Studebaker 2R5 1/2 Ton Rusty Floor, Rusty Cab Mount, Sheet Metal Fabrication. Dakota Swap.
2022-02-061 HP IHC Mogul Throttle Governed Engine Rebuild Restoration, Part 4. Putting It All Back Together.
2022-01-301 HP IHC Mogul Throttle Governed Engine Rebuild Restoration, Part 3. Making a Piston From Scratch.
2022-01-251 HP IHC Mogul Throttle Governed Hit Miss Engine Rebuild, Restoration, Gas Engine. Part 2.
2022-01-221 HP IHC Mogul Throttle Governed Hit Miss Engine Rebuild, Restoration, Gas Engine. Part 1.
2022-01-18Pulling a Studebaker Truck Steering Column Out in The Middle of Winter? Hot Rod Truck.
2022-01-15Studebaker 2R5 1/2 Ton. Fabricating Under Floor Mounted Pedals. Hot Rod Truck.
2022-01-111952 Studebaker 2R5 1/2 Ton Firewall Gets Some Relief Cuts For the Motor.
2022-01-08Studebaker 1/2 Ton, Dakota Frame Swap. Installing a Jeep Cherokee Rear End and New Brakes.
2022-01-04Henry J Gasser Trans Tunnel Fabrication. 327 4 Speed.
2021-12-28Henry J Firewall Fabrication Continued. Sheet Metal Firewall. Metal Forming
2021-12-241952 Studebaker 2R5 Truck Swapping Cabs, on A Dakota Frame.



Tags:
machine shop
lathe
milling machine
fairbanks morse
mogul
titan
john deere
steam engine
stickney
steam tractor
waterloo
chapman
massey harris
hart parr
rumely
pioneer
110 case
happy farmer
hieder
magneto
stover
ingniter
webster mag
farm tractor
antique engine
clutch pully
manitoba
monitor
antique tractor
reeve
antique impliment
aultman taylor
gaar scott
george white
new giant
robert bell
roadkill
roadkill garage
hot rods
speed shop
big 4