1500ft Fresh Air Raise - 25ft in diameter - 80degree incline
Channel:
Subscribers:
34,600
Published on ● Video Link: https://www.youtube.com/watch?v=Fiug-yzqdwc
This is a fresh air raise that delivers ventilation to the lower portion of a mine in Sudbury Ontario. It is 1500ft deep,25ft in diameter and on an 80 degree incline.
The customer reported substantial seismic activity near the bottom of the raise and wanted an idea of the damage.
Our inspection cart (with Pan-Tilt-Zoom camera) makes it to the 1033ft mark where it gets hung up. In the process of freeing it the cart was broken, which you can see towards the end of the video. The camera is hanging by it's power/video connection which allowed us to look back at the damaged cart.
If you have any questions feel free to post
Other Videos By MinewiseTechnology
2020-05-13 | Real Angry Birds - BEST Physics engine! |
2019-06-18 | Minewise - BlackMap Orepass 3D scanning CMS |
2019-06-18 | Minewise - BlackMap stope 3D scanner CMS |
2017-10-24 | BlackMap HD & Silver Reach Inspection System |
2016-09-22 | Minewise suite of products and services |
2013-10-17 | Minewise Technology Ltd. - Inspection Services |
2012-09-08 | Coleman Roadbed Hole |
2012-09-08 | Blasting a blockage |
2011-11-30 | Minewise Technology Video mucking system - Used on LHD |
2011-11-23 | Underground Ore Bin Video Inspection with PTZ |
2010-10-18 | 1500ft Fresh Air Raise - 25ft in diameter - 80degree incline |
2010-05-11 | 15ft Diameter Raise Bore Hole Inspection |
2010-05-01 | Bore hole inspection. |
Tags:
1500ft
FAR
Fresh
Air
Raise
Ventilation
mining
sudbury
ontario
raisebor
raise
bore
camera
inspection
pan
tilt
zoom
PTZ