Boosting railway connectivity, enhancing mobility
In a step towards enhancing mobility and boosting connectivity in Bengaluru, Prime Minister laid the foundation stone of Bengaluru Suburban rail project (BSRP), which will connect Bengaluru city with its suburbs and satellite townships. The project, which is to be built at a cost of over Rs. 15,700 crore, envisages 4 corridors with a total route length of over 148 Kms. Prime Minister also laid the foundation stone of redevelopment of Bengaluru Cantt. and Yesvantpur Junction railway station to be developed at a cost of around Rs 500 crore and Rs 375 crore respectively.
During the Programme, Prime Minister dedicated to the Nation, India’s first Air Conditioned Railway Station - Sir M Visvesvaraya Railway Station at Baiyappanahalli, which is developed on the lines of a modern airport at a total cost of around Rs 315 crore. Prime Minister also dedicated to the Nation the 100 percent electrification of the Konkan railway line (about 740 Kms) from Roha (Maharashtra) to Thokur (Karnataka) by flagging of Electric trains from Udupi, Madagaon and Ratnagiri. The electrification of Konkan railway line has been done at a cost of more than 1280 crore. Prime Minister dedicated to the Nation, two railway line doubling projects : Arsikere to Tumkuru (around 96 km) and Yelahanka to Penukonda (around 120 km) by flagging off passenger trains and MEMU service respectively. The two railway line doubling projects have been developed at a cost of more than Rs 750 crore and Rs 1100 crore respectively.
Subscribe Now: https://goo.gl/8qsb5E Stay Updated! 🔔
Follow us to stay updated:
► Download the NM App: http://nm4.in/dnldapp
► Like us on Facebook: https://facebook.com/narendramodi
► Follow us on Twitter: https://twitter.com/narendramodi
► Follow us on Instagram: http://instagram.com/narendramodi