Building Operation M.U.S.S.E Part 2
Channel:
Subscribers:
1,100
Published on ● Video Link: https://www.youtube.com/watch?v=U5kRHesBHXM
Having worked on the motherboard, we start priming the case.
Note: After this a huge chunk of continuing with the build are not logged. When we resume the system would be 90% built.