Earned Value Analysis|Project's Progress Evaluation and Forecasting in Project Management|EVA|PMP
Channel:
Subscribers:
3,090
Published on ● Video Link: https://www.youtube.com/watch?v=RYdicbDr4mA
In this tutorial, I have discussed in Bangla about the definition and formulas used in Earned Value Analysis (EVA) method that is extensively applied in Project Management with a view to determining a running project's progress at any point in time and also forecasting about the estimated budget at project completion along with estimated project duration. This topic is mostly covered in System Analysis and Design (SAD) or Information System Design (ISD) course of Engineering disciplines.
#EarnedValueAnalysis
#ProjectManagement
#Forecasting
Other Videos By HodgePodge
Tags:
Project Management
Earned Value Analysis
EVA
Earned Value
Actual Cost
AC
EV
Planned Value
PV
ACWP
BCWP
BCWS
Actual Cost of Work Performed
Budgeted Cost of Work Performed
Budgeted Cost of Work Scheduled
Incurred Cost
System Analysis and Design
Information System Design
SAD
ISD
Formulas used in Earned Value Analysis
Project's Progress
Forecasting
Completion Date
Estimated Budget
Work Completion
System Analysis
Information System
Project
Eva example