Project Management: Project Crashing Example | Project Acceleration Example | How to Crash - Part#2
Channel:
Subscribers:
3,030
Published on ● Video Link: https://www.youtube.com/watch?v=R6L41uRddbY
In this and the previous tutorial, I have demonstrated the application of Project Crashing in real life with an example with detailed explanation.
***** I have made a slight mistake in the calculation which is from the duration of 16:04th minute of this video. Here is the correction :
Late start (LS) of activity C is written 6, which is wrong.
C's Late Start (LS) will be 7 (which is 11 - 4). So the total float is 1 (11 - 10 or 7 - 6).
I have also provided this correction with the PDF file. Download the PDF: https://drive.google.com/open?id=1TGV_tMhhbg976uPKQjFY9j1YlxH0N7v7
#ProjectManagement
#PMP
#ProjectCrashing
Other Videos By EduTraGam
Tags:
Project Crashing Example
Project Acceleration Example
Bangla
Project Management
Project Crashing
Project Acceleration
Crashing
Crashing Example
Example of implementing project crashing
Project Crashing Part-1
ISD
SAD
Information System Design
System Analysis and Design
Example of Project Crashing
Example of Project Acceleration
Project
Management
Critical Path Analysis
Total Float
Project Overhead Cost
Crash Cost per day
Crash Duration
how to crash a project