Overwatch Graphic Settings Button To Pixel Delay Analysis

Subscribers:
176,000
Published on ● Video Link: https://www.youtube.com/watch?v=tc5qcynsCkU



Overwatch 2 (formerly Overwatch)
Game:
Duration: 9:42
26,662 views
1,347


In this video I show you the delay that is caused by the graphic settings in Overwatch, so that you can optimize the responsiveness on your system.

*Note:* This is the fixed version of the video. The initial upload had 2 errors.

► Links:
➜ G-Sync: https://youtu.be/F8bFWk61KWA

► Support Battle(Non)Sense:
https://www.patreon.com/battlenonsense

➜ Previous video: https://youtu.be/XkU26yuBI2Q
➜ Next Video: https://youtu.be/ADYzuMe17q8

► Connect with me:
➜ FB: facebook.com/BattleNonSense
➜ twitter: twitter.com/BattleNonSense
➜ email: chris@battlenonsense.com

► My Machinima Channel:
http://bit.ly/1bxw9HX

► Outro Music:
Many of you asked me whats the name of the song that I use in the outro. Sadly I have to tell you that it is not a "song". It is a custom made music to be used for intros/outros that I bought a while ago.







Tags:
Overwatch
Button To Pixel
Delay
Lag
Input lag



Other Statistics

Overwatch 2 Statistics For Battle(non)sense

Battle(non)sense presently has 2,903,335 views for Overwatch 2 across 23 videos, with his channel uploading 4 hours worth of Overwatch 2 videos. This is 7.67% of the total watchable video on Battle(non)sense's YouTube channel.