Process installation of Secant Piles/Contiguous Piles WITOW
Channel:
Subscribers:
2,960
Published on ● Video Link: https://www.youtube.com/watch?v=Cnpwz5v-b5A
"Process Installation of Secant Piles in WITOW Project"
Thanks To All WITOW Crew
Tanks To All WIKA Employee
Production by Bachtiar Arief
uploaded by #CahNdezzo Production
Other Videos By Prasetya D. Perdana
2018-02-09 | Stake pile sequence in Indonesia / Proses pemancangan tiang pancang di Indonesia |
2017-07-03 | WASKITA KARYA : PROYEK JEMBATAN TOL MUSI KAPAL BETUNG PALEMBANG STA 49+611,82 - STA 551+290,35 |
2017-04-01 | Goyang Pancang Part 2 Mas Yusuf PT.WASKITA KARYA, T.BK |
2017-01-06 | GOYANG VANCANG/STAKE DANCING made in INDONESIA PART 1 |
2016-10-08 | Wonosobo Wadaslintang Cangkring river Adventure #VrooghAdventure |
2016-09-02 | Adventure in Windusari Peak,Wadaslintang, Wonosobo, Central Java, Indonesia #VrooghAndventure |
2016-08-11 | InDonesian Kung-fu baby slowmotion (use Andromax R2) |
2016-06-27 | Unique Stopmotion by Nikon D60 |
2016-05-14 | "Puting beliung"wind in Wonosobo, Central java, indonesia |
2015-04-17 | Installation Ground Anchor WITOW Jakarta Indonesia |
2015-03-08 | Process installation of Secant Piles/Contiguous Piles WITOW |
2015-02-02 | "Raft Foundation" making Process in WIKA TOWER project |
Tags:
secant piles
bored piles
Civil Engineer (Profession)
Civil Engineering (Field Of Study)
teknik sipil
deep foundation
Deep Foundation (Project Role)
substructure
pondasi dalam
geotechnic
Design (Industry)
contiguos pile
Foundation (Literature Subject)
swallow foundation
WIKA
WIJAYA KARYA
WASKITA
WASKITA KARYA
hatti
kontraktor
indonesia
bumn
brantas abipraya
excavation
excavator
civil working
concrete
method
construction
geokteknik
excavate
deep
viral
kontruksi