SnowRunner Wisconsin Ep.36 (Finished the Wood Planks and did All 24 Metal Rolls for 12 Metal Beams!)
Still preparing for making track, I finished the wood planks by hauling in a load of medium logs to the Sawmill, then Wood Planks to the Crafting area, Then worked on Hauling 24 Metal Rolls to the Metal Roll Production and Crafting them to 12 Metal Planks and Hauling them back to the Rail Production Crafting Zone and Finally was able to Craft 6 Rail Sections for Repair of the Tracks.
Wow.... I feel like I'm hemorrhaging wood and metal!!!! But ready to lay down some track!
Trying to finish the phase 3 map before phase 4 comes to pts so your getting more wisconsin than normal
Other Videos By Gunslinger SATX
Other Statistics
SnowRunner Statistics For Gunslinger SATX
Gunslinger SATX currently has 130,074 views spread across 801 videos for SnowRunner. His channel uploaded over 30 days worth of SnowRunner videos, or 85.30% of the total watchable video on Gunslinger SATX's YouTube channel.