Wind Mills @ Pililla Wind Farm| Pililla Rizal #philippines

Subscribers:
5,560
Published on ● Video Link: https://www.youtube.com/watch?v=Dp1ejRNyd1k



Duration: 4:58
22 views
1


The "Pililla, Rizal" Wind Energy Service Contract granted to Alternergy Philippine Holdings Corporation (APHC) covers an area of 4,515 hectares under Department of Energy WESC NO. 2009-09-018. This Wind Energy Service Contract (WESC) has two phases, Pililla Wind Power Project under WESC NO. 2009-09-018-AF1 and the Mt. Sembrano Wind Power Project under WESC NO. 2009-09-018-AP2.

In December 2008, Alternergy Philippine Holdings Corporation (APHC) was awarded by the Department of Energy (DOE) the exclusive right to develop wind power projects in 3 locations: Pililla in Rizal, Abra de Ilog in Occidental Mindoro, and Kalayaan, Laguna. These locations were among those identified under the Philippine Wind Atlas as potential sites for wind farms due to good to excellent wind resources. APHC was subsequently awarded additional wind energy service contracts in 3 other locations in 2009. APHC is committed to implementing the wind projects if the wind measurements and site-specific studies demonstrate that the power plants are commercially viable.

Phase 1 of this project is a wind farm in Barangay Halayhayin in Pililla, Rizal, Philippines. The wind farm is being undertaken by Alternergy Wind One Corporation. The total cost for the construction of the wind farm is US$177.9 million.

The project consists of 27 wind turbine generators grouped into three clusters with an aggregate capacity of 54 megawatts (MW). The said project, after completion, will interconnect to Meralco's Malaya-Teresa 115 kilovolts (kV) transmission line located just 10 kilometers from the project site.

Phase 2 located in Pililla, Rizal and Mabitac, Laguna was not initially included by Alternergy Philippine Holdings Corporation (APHC) in the Technical Assistance (TA) from the Asian Development Bank. A minor change in the ADB TA implementation was approved in February 2013 to prioritize the development of the Pililla, Rizal wind farm site and expand the study to Pililla Stage 2, which covers the southern portion of the area, as initial findings showed certain limitations in wind resource and constructability in the Laguna and Occidental Mindoro sites. Construction of a wind power project in Abra de Ilog, Occidental Mindoro, in particular, is not feasible until either the National Grid Corporation of the Philippines (NGCP) or the Philippine government has installed a submarine cable connecting Mindoro and Luzon. Based on the initial findings, further studies on the Laguna and Mindoro sites were discontinued; unutilized TA budget for these sites was reallocated instead to fund the study for Pililla Stage 2. The projected cost for Phase 2 is Php 7.056 Billion and its planned output is 72 megawatts (MW).

IMPORTANT DISCLAIMER!

The views and opinions expressed in this video are of my own and do not necessarily reflect the official policy or position of any organizations or agencies to which I may be associated. All content provided in this video and channel is for educational and entertainment purposes only. They are not intended to endorse illegal, immoral or oppressive practices nor to malign any, religion, ethnic group, organization, company or individual. Viewers are highly encouraged to be critical and to conduct further research into the featured topics.
———————————————————————
For more videos and vlogs please subscribe and don’t forget to hit the bell button on so you won’t missed my new videos!
———————————————————————
If you like this video please consider to:

✅Like
✅ Share
✅ Subscribe

KEEP IN TOUCH:
Facebook: kgmilanes
———————————————————————
I DO NOT OWN THE MUSIC/ OR SOUND BACKGROUND IN THE VIDEO
———————————————————————
“NO COPYRIGHT INFRINGEMENT INTENDED”
———————————————————————

All the videos, songs, images, and graphics used in the video belong to their respective owners and I or this channel does not claim any right over them.

Copyright Disclaimer under section 107 of the Copyright Act of 1976, allowance is made for “FAIR USE” for purposes such as criticism, comment, news reporting, teaching, scholarship, education and research. Fair use is a use permitted by copyright statute that might otherwise be infringing.




Other Videos By Kimmerman Studio


2024-02-21Bandai - Gundam F91 Master Grade #gundam #gunplabuilder #bandai #anime #thegunplameister
2024-02-21Bandai - Sakugan Big Tony 1/48 #gundam #gunplabuilder #bandai #anime #thegunplameister
2024-02-21Bandai - Patlabor AV-98 Ingram Shinohara #gundam #gunplabuilder #bandai #anime #thegunplameister
2024-02-20Gunpla Build Livestream | Bandai Infinite Justice Gundam Master Grade 1/100
2024-02-10Bandai - Gundam Wing Proto Zero MG - UNBOXING part 1 [003]
2024-02-10Bandai - Mailes Kenbu Full Mechanics 1/48 Scale - UNBOXING part 1 [002]
2024-02-10Bandai and Bootlegs (Daban, Dragon Momoko, GaoGao) - What's the Difference? - Newbies Must Watch
2024-02-10Bandai - Turn-A Gundam Mobile Sumo 1/100 Scale - UNBOXING and REVIEW [001]
2024-02-10Moderoid Rune God Rayearth #moderoid
2024-02-10Venice Grand Canal Mall - What's Inside? #venicegrandcanalmall
2024-02-10Wind Mills @ Pililla Wind Farm| Pililla Rizal #philippines
2024-01-08HobbyLink Japan Order UNBOXING - Gunpla and Mecha Model Kits - Kotobukiya Bandai Good Smile Moderoid
2024-01-08Gundam and Mecha Model Kit Showcase part 1 | Bandai Kotobukiya Moderoid Good Smile Aoshima
2024-01-06Spaghetti Ala Jollibee Style | I Beat the Jolly Spaghetti
2024-01-04Gunpla Build Livestream | Bandai RX-77-2 Guncannon Master Grade 1/100
2024-01-03Gunpla Build Livestream | Bandai Turn A Gundam Master Grade 1/100
2023-12-31MMSR Clinic VS JHAH Clinic | Which is the BEST Choice in Saudi ARAMCO Remote Area Clinic System?
2023-12-25My EXIT Tribute - Farewell Saudi Arabia - Retiring from Remote Area Clinic Nurse Job #retirement
2023-12-24Final Work Day at ARAMCO Remote Area Clinic - Farewell Saudi Arabia - #remotejobs #nursejobs
2023-12-24Advantage of Working at REMOTE AREA CLINICS in Saudi Arabia | Saudi ARAMCO MMSR / JHAH Clinics
2023-12-24Nurse Accommodation in Saudi Arabia - Massaya Hotel; Al Khobar



Tags:
Pililla Rizal
Rizal
Pililla Wind Farm
Rizal Province
Alternative Energy
Alternergy Wind One Corporation
Alternergy
Renewable Energy
Energy
Wind
Wind Energy