Christrains Stadler GTW - Model Details Gameplay TS2017 PC HD

Subscribers:
49,500
Published on ● Video Link: https://www.youtube.com/watch?v=Q-0c3eBK0AU



Duration: 4:12
315 views
2


A reproduction of the Stadler GTW passenger train that can be seen all over Europe. Diesel and electric versions. The Stadler GTW is an articulated railcar for local transport made by Stadler Rail of Switzerland. GTW stands for Gelenktriebwagen (articulated railcar).

The Biel–Täuffelen–Ins-Bahn near Bern, Switzerland was looking for a lighter train model to replace its aging fleet, so that a low floor system does not require heavy installations on the roof. Based on that requirement Stadler came up with a concept of placing most of the equipment in a central unit between the seating cars. While the BTI-Bahn tracks are meter gauge, Stadler presented the first prototype in 1995 set on standard gauge rails, and the Mittelthurgau-Bahn tested three prototypes on its standard gauge network during 1996.

The rolling stock for Mittelthurgau was later expanded to 10 GTW 2/6 (built 1998–1999) that are now part of the THURBO fleet (the three prototypes were sold to Italy). The next lots were produced in meter gauge, and were delivered to the BTI-Bahn and the CEV-Bahn (Chemins de fer électriques Veveysans) in 1997 - although the BTI-Bahn was first to order any GTWs with its 7 trains, the CEV-Bahn ordered the biggest lot of the first generation with 20 trains.

In 1998 the Linzer Lokalbahn (Austria) placed an order which needed to be modified to conform to the DIN 5510 class 2 safety standard, as well as different electrification. These 8 trains were delivered in 2000 from the Swiss facilities and an option of 6 more trains was fulfilled in 2005. Another modification was done for the River Line (New Jersey) with an order of 20 DMUs delivered in 2002/2003 from the Swiss facilities.

During that time the Hessische Landesbahn (HLB) in Germany was also looking at the new system but actual procurement was delayed until the second generation. In the beginning, Stadler was cooperating with ADtranz/DWA im Germany with the initial batch produced in 1999 at DWA Bautzen (Saxony). Its headshape design follows the style of the Deutsche Bahn trains as they were already on production at DWA, and eventually the DB Regio services also ordered a batch of 30 trains of a similar type as the 30 trains ordered by the HLB (only the height of the low floor section differs). The full series were then manufactured at the new Stadler Pankow (Berlin) facilities being built in 2000 by a joint venture with ADtranz. Stadler acquired their shares in 2001 and the final vehicles were delivered from that plant in 2001 by Stadler alone. #Trains #Trainsimulator #Trainz







Tags:
Christrains
Christrains Stadler GTW
TS2017
train simulator 2017
Stadler Flirt 3
train simulator
fsxnoob
SLT Sprinter
dutch trains
treinen
SGM Sprinter
IRM
NS DM90
trainz
Auckland Transport ADL / ADC
DH1/DH2
Class 2200
ns2200
NS mP3000
GE-90
EMD GP35
Western Pacific
Class 222 Advanced
Class 20
DTM SD50 Conrail
GP35
LNER V2
LNER K4
BR 7MT
BR03 Class locomotive
Class 5MT
simulator games
TS2017 gameplay
ts
Stadler GTW
gtw
stadler
train
trains
station