How difficult could it be to transport wind turbine blades to the top of a cliff
Channel:
Subscribers:
1,350,000
Published on ● Video Link: https://www.youtube.com/watch?v=lxIs9LoEJNc
This #windturbine blade is 75 meters long and weighs 19 tons. There are dozens of bends on this hillside road. It takes two weeks to transport a blade to the top of this #cliff.
Workers need to overcome extreme cold and altitude sickness as well as heavy storms and snow. #China #transport