Minecraft Metro Full-length Ride | Nazca Railway: Line 6 (Phase 9) to Fall Point
Nazca Railway, one of the largest Minecraft subway systems ever built. Now presenting front view of the ride of Line 6, Arcgo Line (Phase 9), Fall Point direction. Enjoy!
Line 6 is one of the 6 core lines in Nazca Railway and a northern-central configuration, also considering Metropolis Terminal the central station. At Phase 9 extension, Arcgo Line extended to the northwest by 3 new stations from Dansein Market to a new Gateway called "Fall Point." This line is renowned for its curse that the entire track is covered no matter its local altitude.
Timestamp:
00:00 (6)-13 Cooace Hill Station
02:11 (6)-12 Circle Pit Station
03:31 (6)-11 Peaceful Steps Station
05:02 (6)-10 Vertow Valley Station
06:54 (6)-09 Ingress Beach Station
08:42 (6)-08 Thin River Station
10:11 (6)-07 Internal River Station
11:52 (6)-06 Internal Sea West Station
14:04 (6)-05 High Parallel Station
16:15 (6)-04 Fosina Station
17:57 (6)-03 Katadelphia North Checkpoint
19:46 (6)-02 San Annis Station
21:00 (6)-01 Origin Station
22:29 (6)-00 Metropolis Terminal
23:55 01-(6) Metro River Station
25:25 02-(6) Bonyal Bay Station
27:42 03-(6) Vayler Station
29:24 04-(6) Mayler Station
31:58 05-(6) Jayler Station
34:46 06-(6) Star Island Station
36:10 07-(6) Inthree Island Station
37:43 08-(6) Deepond Island Station
39:43 09-(6) Fansim Island Station
41:17 10-(6) Eagle Island Station
42:50 11-(6) Landing Pole Station
44:48 12-(6) Pingsing Station
46:02 13-(6) Dansein Joint Station
47:49 14-(6) Dansein Market Station
49:23 15-(6) North Coast Road Station
50:40 16-(6) Havenore Station
52:36 17-(6) Fall Point Gateway
Other Videos By Nazca Railway
Other Statistics
Minecraft Statistics For Nazca Railway
There are 1,055,413 views in 195 videos for Minecraft. There's over 4 days worth of watchable video for Minecraft published on his channel, or 86.82% of the total watchable video on Nazca Railway's YouTube channel.