Modern Combat 4 Zero Hour_Mission 7_Critical Path_Mobile Gameplay Walkthrough.
About This Game_Action FPS elite soldiers warfare game
An action FPS game with a chapter to push the boundaries of mobile gaming even further. In the wake of nuclear warfare, the only chance to avoid global devastation is in the hands of the few elite soldiers who must track down and rescue the world’s leaders from a frighteningly familiar terrorist group.
Action shooter warfare
Feel the story’s dramatic intensity and see both sides of the story by also playing the villain, Edward Page.
Dominate the battlefield with a new tactical movement system.
Wage war and take action all over the world, from Antarctica to Barcelona.
Experience an action FPS
Feel the chaos of war on the battlefield with console-like graphics, lifelike animations and dynamic objects.
The first Gameloft title powered by the Havok Engine for amazing ragdoll effects. Warfare never felt so realistic.
Improved sound & voice acting performed by a renowned studio in the movie industry.
Multiplayer game mode
Forge your own gameplay profile online with an improved loadout system & over 20,000 weapon arrangements.
A specialization system with redesigned skills.
Lead your character to the top of the online leaderboards with a new ranking system.
Find all the information for MC4 on http://www.modern-combat.net.
Minimum hardware requirements to play Modern Combat 4:
- 1 GHz CPU
- 512 MB RAM
- Adreno 205 GPU or equivalent
- Available storage: 1.9 GB
Other Videos By Mr.NOBODY22
Other Statistics
Modern Combat 4: Zero Hour Statistics For Mr.NOBODY22
Currently, Mr.NOBODY22 has 22 views for Modern Combat 4: Zero Hour across 12 videos. The game makes up 2 hours of published video on his channel, or 1.28% of the total watchable video for Modern Combat 4: Zero Hour on Mr.NOBODY22's YouTube channel.