Nefarians (pt 3 of 3) - Dragon | SpeedSculpt + Paint + Review | World of Warcraft | by SilentKimiya
It was long-term project - took me around 90 hours! Nefarian the dragon took 2/3 of all that time.
It was first project, which required stone as the base.
It was hard project, that required proper positions for both characters and the objects.
It was fun project - how often do you manage to work on a sculpture of a dragon and a cat, playing with the ball together?
It was big... no, it was huge project - I even needed to buy new background for the photos, as my previous ones were too small.
It was great and memorable project.
Part 1 - https://youtu.be/QUHICbnG4sk
Part 2 - https://youtu.be/J5Kkbw2LFL4
Enjoy the videos!
Subscribe and stay with me to see more sculpting and painting processes!
____________________
INSTAGRAM: https://www.instagram.com/silentkimiya/
ETSY: https://www.etsy.com/shop/SilentKimiya
00:00 // sculpting
04:10 // sculpting review
05:06 // painting
07:14 // final review
Other Videos By Silent Kimiya
Other Statistics
World of WarCraft Statistics For Silent Kimiya
At this time, Silent Kimiya has 9,209 views for World of WarCraft spread across 29 videos. World of WarCraft has approximately 1 hour of watchable video on his channel, or 19.05% of the total watchable video on Silent Kimiya's YouTube channel.