Omega Race - Part 1

Channel:
Subscribers:
1,700
Published on ● Video Link: https://www.youtube.com/watch?v=uiGQ8AAo4Go



Game:
Omega Race (1981)
Duration: 10:08
255 views
6


I traded a local collector a Juno First PCB for an Omega Race. I had bought the Juno First some time ago and fixed it but hadn't played it because the vertical orientation of the game in my Blast City cabinet is opposite of all my other vertical games.

The collector friend I traded the PCB to has two Juno First cabinets and one PCB that is currently not working correctly. The Omega Race was working but the monitor developed a fault.

This is the third Omega Race cabinet I have had. I bought my first one in 2008 and later sold it. I bought my second in 2010 and later sold it. Now I have my third in 2018. I'll try and hold onto this one!







Tags:
arcade
Omega Race
gaming



Other Statistics

Omega Race Statistics For TomsProjects

There are 694 views in 7 videos for Omega Race. The game makes up 1 hour of published video on his channel, or 2.04% of the total watchable video for Omega Race on TomsProjects's YouTube channel.