Omega Race - Part 7 - Final!

Channel:
Subscribers:
1,710
Published on ● Video Link: https://www.youtube.com/watch?v=etDCiMJbskI



Game:
Omega Race (1981)
Duration: 23:18
92 views
2


This is the final video in the Omega Race series! I have just installed the replacement florescent artwork that I made. It glows nice and bright and unless you are really familiar with Omega Race, I don't think you'd even know it wasn't original.

About the only things I have left to do is install the NVRAM module that will save high scores without the use of a battery that the original setup required, and a bit of cleaning of the coin door.

I didn't expect it to take this long to get the game done, but it turned out really nice. Thanks to Todd for making a trade with me for the cabinet, and to Gary for letting me have his spare control panel with much nicer artwork. Also thanks to KLOV, where I searched for threads on Omega Race and vector monitor repair that allowed me to fix the games electronics.







Tags:
omega race
arcade



Other Statistics

Omega Race Statistics For TomsProjects

There are 694 views in 7 videos for Omega Race. The game makes up 1 hour of published video on his channel, or 2.04% of the total watchable video for Omega Race on TomsProjects's YouTube channel.