101. | Mount parts for my Samsung Tab S 10.5" tablet. | 32 | |
|
102. | Can Crusher - Belt guards installed. | 30 | |
|
103. | Hydroneer 2.0.2 Day 4 Huge T1 Drill Funnel at Ember | 30 | | Hydroneer
|
104. | Hydroneer 2.0.5 Day 19 T1/T2 Drill Funnels @South Hope | 29 | | Hydroneer
|
105. | Hydroneer 2.0.8 Day 39 Widening the 15 Huge T1/T2 Drill Funnels(1080 T2 Drills ATM) at South Hope | 29 | | Hydroneer
|
106. | Hydroneer 2.0.8 Day 36 Widening the 15 Huge T1/T2 Drill Funnels(1080 T2 Drills ATM) at South Hope | 29 | | Hydroneer
|
107. | Can crusher assembly part 1 | 29 | |
|
108. | Hydroneer 2.0.5 Day 18 Part 1 of 2 T1/T2 Drill Funnels @South Hope | 29 | | Hydroneer
|
109. | Hydroneer 2.0.6 Day 29 - 15 T1/T2 Drill Funnels @South Hope Windows done for now | 29 | | Hydroneer
|
110. | Hydroneer 2.0.2 Day 7 Huge T1 Drill Funnel at Ember | 29 | | Hydroneer
|
111. | Hydroneer 2.0.8 Day 40 Widening the 15 Huge T1/T2 Drill Funnels(1080 T2 Drills ATM) at South Hope | 29 | | Hydroneer
|
112. | RockCan Crusher Machine - Showing how the smaller ripples get put into the new Ripple Plate. | 28 | |
|
113. | Can Crusher - Part 1&2 8x speed - Wheel groove cutting and mounting hole thoughts. | 28 | |
|
114. | Can Crusher machine - Showing how the grooves are made-cut wit... | 28 | |
|
115. | Hydroneer 2.0.5 Day 23 - 15 T1/T2 Drill Funnels @South Hope | 28 | | Hydroneer
|
116. | Hydroneer 2.0.8 Day 49 Widening the 15 Huge T1/T2 Drill Funnels(1080 T2 Drills ATM) at South Hope | 27 | | Hydroneer
|
117. | Hydroneer 2.0.8 Day 33 Crafting/Testing 864 & 936 T2 Drills for the 15 Funnels @South Hope | 27 | | Hydroneer
|
118. | RockCan Crusher Machine - Brace Installed & Crushing Cans. | 27 | |
|
119. | Hydroneer 2.0.8 Day 31 Crafting/Testing 648 T2 Drills for the 15 Funnels @South Hope | 26 | | Hydroneer
|
120. | FS22-Year 1 DLC-Platinum Expansion Map-Silverrun Forest-Day 2 | 26 | | Farming Simulator 22
|
121. | Can crusher - final assembly in working order. | 26 | |
|
122. | Hydroneer 2.0.8 Day 37 Widening the 15 Huge T1/T2 Drill Funnels(1080 T2 Drills ATM) at South Hope | 26 | | Hydroneer
|
123. | Hydroneer 2.0.0 Day 2 at Ember | 25 | | Hydroneer
|
124. | Hydroneer 2.0.8 Day 50 Widening the 15 Huge T1/T2 Drill Funnels(1080 T2 Drills ATM) @ South Hope | 25 | | Hydroneer
|
125. | Hydroneer 2.0.8 Day 34 Crafting/Testing 1,008 T2 Drills for the 15 Funnels @South Hope | 24 | | Hydroneer
|
126. | Hydroneer 2.0.5 Day 24 (Part 1 of 2) - 15 T1/T2 Drill Funnels @South Hope | 24 | | Hydroneer
|
127. | Can Crusher machine running with sturdy motor mounts. | 23 | |
|
128. | Hydroneer 2.0.5 Day 18 Part 2 of 2 T1/T2 Drill Funnels @South Hope | 21 | | Hydroneer
|
129. | Hydroneer 2.0.4 Day 9 Huge T1 Drill Funnel at Ember | 21 | | Hydroneer
|
130. | Can Crusher - Part 2 8x speed - Finishing the wheel grooves and mounting hole thoughts. | 20 | |
|
131. | Hydroneer 2.0.4 Day 12 Part 2 of 2 T1/T2 Drill Funnel @South Hope | 20 | | Hydroneer
|
132. | Dual monitor (new 32"LED & my old 22"LCD) install from my Live Twitch Stream | 19 | |
|
133. | Hydroneer 2.0.5 Day 26 - 15 T1/T2 Drill Funnels @South Hope | 19 | | Hydroneer
|
134. | Hydroneer 2.0.5 Day 13 Part 2 of 2 T1/T2 Drill Funnels @South Hope | 19 | | Hydroneer
|
135. | Can crusher machine wobbleness solved, for now. | 19 | |
|
136. | Rgb stuffs | 19 | |
|
137. | Captain of Industry 0.4.10 Day 7 | BIRTHDAY WEEKEND | 19 | | Captain of Industry
|
138. | Hydroneer 2.0.5 Day 13 Part 1 of 2 T1/T2 Drill Funnels @South Hope | 19 | | Hydroneer
|
139. | Hydroneer 2.0.5 Day 15 Part 1 of 2 T1/T2 Drill Funnels @South Hope | 18 | | Hydroneer
|
140. | Hydroneer Before the 2.0 Update | 400 David's & Goliath's into 1 Harvester Funnel Test | 18 | | Hydroneer
|
141. | Hydroneer 2.0.4 Day 11 Part 1 T1/T2 Drill Funnel @South Hope | 18 | | Hydroneer
|
142. | Can Crusher - Bracing for the belt guards. | 18 | |
|
143. | Can Crusher - Mounting slot holes finished. | 17 | |
|
144. | Captain of Industry 0.4.11 Day 9 | 17 | | Captain of Industry
|
145. | Captain of Industry 0.4.11 Day 10 | 17 | | Captain of Industry
|
146. | Captain of Industry v0.4.9 Day 1 (Part 1 of 2) | 17 | | Captain of Industry
|
147. | Can Crusher - Part 2 1x speed - Finishing the wheel grooves & mounting hole thoughts. | 17 | |
|
148. | Hydroneer 2.0.8 Day 47 Widening the 15 Huge T1/T2 Drill Funnels(1080 T2 Drills ATM) at South Hope | 16 | | Hydroneer
|
149. | Hydroneer 2.0.5 Day 15 Part 2 of 2 T1/T2 Drill Funnels @South Hope | 16 | | Hydroneer
|
150. | Hydroneer 2.0.3 Day 8 Huge T1 Drill Funnel at Ember | 16 | | Hydroneer
|
151. | Hydroneer 2.0.5 Day 22 - 15 T1/T2 Drill Funnels @South Hope | 14 | | Hydroneer
|
152. | Can crusher assembly part 2 | 14 | |
|
153. | Hydroneer 2.0.8 Day 46 Widening the 15 Huge T1/T2 Drill Funnels(1080 T2 Drills ATM) at South Hope | 14 | | Hydroneer
|
154. | Captain of Industry 0.4.10 Day 5 (Part 1 of 2) | 14 | | Captain of Industry
|
155. | Can Crusher - Update on its status :-) | 14 | |
|
156. | Hydroneer 2.0.1 Day 3 Part 2 of 2 Huge T1 Drill Funnel at Ember | 13 | | Hydroneer
|
157. | Captain of Industry v0.4.9 Day 1 (Part 2 of 2) | 13 | | Captain of Industry
|
158. | Can Crusher - Part 1 1x speed - Cutting the wheel grooves with a back saw | 12 | |
|
159. | Hydroneer 2.0.5 Day 24 (Part 2 of 2) - 15 T1/T2 Drill Funnels @South Hope | 12 | | Hydroneer
|
160. | Captain of Industry v0.4.9 Day 3 (Part 2 of 2) | 12 | | Captain of Industry
|
161. | Captain of Industry v0.4.9 Day 3 (Part 1 of 2) | 12 | | Captain of Industry
|
162. | Hydroneer 2.0.8 Day 45 Widening the 15 Huge T1/T2 Drill Funnels(1080 T2 Drills ATM) at South Hope | 11 | | Hydroneer
|
163. | Hydroneer 2.0.8 Day 43 Widening the 15 Huge T1/T2 Drill Funnels(1080 T2 Drills ATM) at South Hope | 11 | | Hydroneer
|
164. | Can Crusher - Mounting hole slot cut by old router with 1/2"x1" bit(China). | 11 | |
|
165. | Hydroneer 2.0.8 Day 42 Widening the 15 Huge T1/T2 Drill Funnels(1080 T2 Drills ATM) at South Hope | 11 | | Hydroneer
|
166. | Can crusher test no.2 with 4 solid wheels & 2 view points. | 10 | |
|
167. | Captain of Industry v0.4.9 Day 2 | 10 | | Captain of Industry
|
168. | Captain of Industry v0.4.9 Day 4 | 10 | | Captain of Industry
|
169. | Captain of Industry 0.4.11 Day 8 | 10 | | Captain of Industry
|
170. | Can Crusher - 6x Speed - Cutting the mounting slot w/Router. | 9 | |
|
171. | Hydroneer 2.0.2 Day 5 Part 2 of 2 Huge T1 Drill Funnel at Ember | 9 | | Hydroneer
|
172. | Hydroneer 2.0.4 Day 12 Part 1 of 2 T1/T2 Drill Funnel @South Hope | 9 | | Hydroneer
|
173. | Can Crusher - Part 1 2x speed - Cutting the wheel grooves with a back saw | 9 | |
|
174. | My new belt sander. | 8 | |
|
175. | Can Crusher - Part 1&2 1x speed - Wheel groove cutting and mounting hole thoughts. | 8 | |
|
176. | Can Crusher - Part 1 8x speed - Cutting the wheel grooves with a back saw | 8 | |
|
177. | Can Crusher - Part 1&2 2x speed - Wheel groove cutting and mounting hole thoughts. | 8 | |
|
178. | Tablet holder for my tripod, no cost in materials. Part 1 - 2 | 7 | |
|
179. | Can Crusher - 2x Speed - Cutting the mounting slot w/Router. | 7 | |
|
180. | Tablet holder for my tripod, no cost in materials. Part 2 | 7 | |
|
181. | Can Crusher - Part 1 4x speed - Cutting the wheel grooves with a back saw | 7 | |
|
182. | Tablet holder for my tripod, no cost in materials. Part 1 | 6 | |
|
183. | Hydroneer 2.0.8 Day 38 Widening the 15 Huge T1/T2 Drill Funnels(1080 T2 Drills ATM) at South Hope | 6 | | Hydroneer
|
184. | Can Crusher - Cutting the mounting slot w/Router. | 5 | |
|
185. | Can Crusher - Part 2 2x speed - Finishing the wheel grooves and mounting hole thoughts. | 3 | |
|
186. | Hydroneer 2.0.4 Day 11 Part 2 of 2 T1/T2 Drill Funnel @South Hope | 3 | | Hydroneer
|