3D Printer Voron 2.4 Rev. C 350mm - Build Progress Part 18

Channel:
Subscribers:
1,700
Published on ● Video Link: https://www.youtube.com/watch?v=FIu7jd0jEew



Duration: 0:00
811 views
9


First quad gantry level with the Nitehawk-SB toolhead PCB.

In the video I state that it's the first gantry level with the carbon fiber gantry, but this is incorrect. I had done a successful gantry level with the original toolhead PCB, with the 14 wire harness draped over the top of the printer frame.
The Nitehawk-SB uses USB protocol to send/receive power and information to the toolhead, rather than using individual wires. It's an alternative to the more common CANBUS option, which uses the same principal but with a different protocol.