Amiga 1000 - Part 4

Channel:
Subscribers:
1,700
Published on ● Video Link: https://www.youtube.com/watch?v=xMBfzG5JzIs



Duration: 0:00
240 views
10


Testing the audio and the Gotek virtual floppy drive.
It looks like I'll need to figure out how to make the Gotek drive load Kickstart, as it isn't just automatically loading it when it's selected on the Gotek.

The 'DANGER' screen when trying to boot the Amiga Test Kit disk shows 'TWINKICK FINAL'. The physical Kickstart disk I've been using is a TwinKick disk that first loads Kickstart 1.3 and if you leave the disk in it will then load Kickstart 3.1. I'll make a Kickstart 1.3 disk and that should get rid of that message, although it is pretty cool that the Test Kit does that.