Critical Path Analysis (CPA) using the Precedence Diagram Method (PDM) | EST, EFT, LST, LFT, TF, FF

Channel:
Subscribers:
3,030
Published on ● Video Link: https://www.youtube.com/watch?v=vPCZ2pay5Kk



Duration: 53:45
2,043 views
0


In this tutorial, a detailed example regarding the Critical Path Analysis of a project using the Precedence Diagram Method (PDM) has been explained in Bangla with necessary figures and proper calculations.

This tutorial explains,
(i) how to construct the Activity-On-Node (AON) Diagram and also the PDM Network Diagram from a given project schedule
(ii) how to compute the Early Start (ES) or Early Start Time (EST), Early Finish (EF) or Early Finish Time (EFT), Late Start (LS) or Late Start Time (LST), Late Finish (LF) or Late Finish Time (LFT), Float/Slack, Total Float (TF) or Total Slack (TS) and Free Float (FF) or Free Slack (FS) for a given project schedule
(iii) how to find out the Critical Activities along with the Critical Path/Paths of an project on hand.

Slide link: https://drive.google.com/file/d/1Zxj_hA1pnYqGXomYRrODVczjyxroiy5d/view?usp=sharing




Other Videos By EduTraGam


2020-09-14Assigning Values to Different Array Elements of an One-Dimensional Array at Coding Time [Part-1]
2020-09-13Necessity of Array in C Structured Programming Language | Why and when do we need to use Array in C
2020-09-13Memory Allocation of Array Elements | Memory Address of any Element using the Base Address of Array
2020-09-12Arrays | Array Declaration | Size of an Array | Index/Subscript
2020-09-12Use of continue statement within while loop and for loop in C Structured Programming Language
2020-09-01Project Crashing | Discussion on Project Crashing | Project Acceleration | How to Crash a Project
2020-09-01For Loops in C Structured Programming Language|Nested For Loops in C Structured Programming Language
2020-08-18Activity-On-Arrow (AOA) PERT Diagram Construction From Project Schedule| Worked Out Example [Part-4]
2020-08-18Activity-On-Arrow (AOA) PERT Diagram Construction From Project Schedule| Worked Out Example [Part-3]
2020-08-17Significance of Total Float (TF)/Total Slack (TS) and Free Float (FF)/Free Slack (FS) in CP Analysis
2020-08-13Critical Path Analysis (CPA) using the Precedence Diagram Method (PDM) | EST, EFT, LST, LFT, TF, FF
2020-08-11Bitwise Operators in C Structured Programming Language |Bitwise AND, OR, NOT, XOR, Shifting Operator
2020-08-11Logical Operators in C Structured Programming Language | Example
2020-08-11Relational Operators in C Structured Programming Language | Example
2020-08-09GANTT Chart | Definition | Characteristics | Example | How to Construct | Advantages | Disadvantages
2020-08-08AOA Diagram Example| Activity-On-Arrow (AOA) PERT Diagram Construction - Worked Out Example [Part-1]
2020-08-08AOA Diagram Example| Activity-On-Arrow (AOA) PERT Diagram Construction - Worked Out Example [Part-2]
2020-08-06Activity-On-Node (AON) PERT Diagram Construction - Worked Out Example |How to construct AON Diagram
2020-07-27Use of Different Arithmetic Operators in C Structured Programming Language (Coding Example)
2020-07-27Arithmetic Operators in C Structured Programming Language | Use of + - * / % Arithmetic Operators
2020-07-27Operational Feasibility Analysis/Study in an Information System Design [Part-1]



Tags:
Critical Path Analysis
CPA
Critical
Path
Analysis
Precedence Diagram Method
PDM
Precedence
Diagram
Method
Network Diagram
Network
Early Start
Early Finish
Late Start
Late Finish
Total Float
Float
Slack
Free Float
Free Slack
EST
ES
EF
EFT
LS
LST
LF
LFT
TF
FF
Project
Project Management
Critical Activity
Acitivity
Dependency
Finish-to-Start Relationship
FS Relationship
Management
Total Slack
Duration
Critical path method
Precedence diagram