Significance of Total Float (TF)/Total Slack (TS) and Free Float (FF)/Free Slack (FS) in CP Analysis
Channel:
Subscribers:
3,030
Published on ● Video Link: https://www.youtube.com/watch?v=7QRhvg40-Jc
In this tutorial, the Significance of Total Float (TF)/Total Slack (TS) and Free Float (FF)/Free Slack (FS) in Critical Path Analysis (CPA) using the Precedence Diagram Method (PDM) has been discussed in Bangla with proper examples.
Slide link: https://drive.google.com/file/d/1Zxj_hA1pnYqGXomYRrODVczjyxroiy5d/view?usp=sharing
Other Videos By EduTraGam
Tags:
Free
Float
Slack
Total
Free Float
Free Slack
Total Float
Total Slack
TF
TS
FF
FS
Significance of TF and FF
CPA
Critical
Path
Analysis
Precedence
Diagram
Method
PDM
Critical Path Analysis
Precedence Diagram Method
What is free float
What is total float
what is FF
what is TF
what is total slack
what is free slack
what is FS
what is TS
float/slack
delay
project management
project
schedule
critical path
critical activity
non-critical activity