House of the Dead 4 working!!

Channel:
Subscribers:
1,700
Published on ● Video Link: https://www.youtube.com/watch?v=406AdlaReL8



Duration: 8:42
97,977 views
418


I hooked up the Lindbergh today with both guns. I had replaced the trigger and grenade microswitches in them since the last video. This test shows that the system is now completely working, including the guns shake to reload feature.
To start a game I was shorting the P1 and P2 wires to the ground wire in the control panel connector.







Tags:
sega
lindbergh
arcade
house of the dead 4



Other Statistics

The House of the Dead 4 Statistics For TomsProjects

There are 102,829 views in 2 videos for The House of the Dead 4. Less than an hour worth of The House of the Dead 4 videos were uploaded to his channel, making up less than 0.45% of the total overall content on TomsProjects's YouTube channel.