Merit Pit Boss Bar Tops - Part 4
Channel:
Subscribers:
1,700
Published on ● Video Link: https://www.youtube.com/watch?v=YGK-9PCvaOg
I've now tested the Raspberry Pi 3 B+, audio amp and monitor. All are working correctly. I had a little scare the first time I powered everything up in the last video, where the Pi booted, shut down and rebooted. The cause of that was that I had replaced the micro SD card with a smaller one. When you first boot up a card with a freshly installed RGB-Pi OS it will boot up, set up the SD card, then reboot.
Next I need to wire up controls, followed by securing everything in the cabinet.
Other Videos By TomsProjects
2022-06-28 | Asteroids Deluxe Cabaret - Part 8 |
2022-05-11 | Asteroids Deluxe Cabaret - Part 5 |
2022-05-11 | Asteroids Deluxe Cabaret - Part 6 |
2022-05-03 | Asteroids Deluxe Cabaret - Part 3 |
2022-05-03 | Asteroids Deluxe Cabaret - Part 4 |
2022-05-03 | Asteroids Deluxe Cabaret - Part 1 |
2022-05-03 | Asteroids Deluxe Cabaret - Part 2 |
2022-04-19 | Merit Pit Boss Bar Tops - Part 7 - Final |
2022-04-02 | Merit Pit Boss Bar Tops - Part 6 |
2022-04-02 | Merit Pit Boss Bar Tops - Part 5 |
2022-04-02 | Merit Pit Boss Bar Tops - Part 4 |
2022-03-24 | Merit Pit Boss Bar Tops - Part 2 |
2022-03-24 | Merit Pit Boss Bar Tops - Part 3 |
2022-03-17 | Merit Pit Boss Bar Tops - Part 1 |
2022-02-26 | Double Dragon - JAMMA connector - Part 1 |
2022-02-26 | Double Dragon - JAMMA connector - Part 2 |
2022-01-21 | Operation Double Double Dragon - Part 8 - Final! |
2022-01-18 | Operation Double Double Dragon - Part 7 |
2022-01-18 | Operation Double Double Dragon - Part 6 |
2022-01-18 | Operation Double Double Dragon - Part 5 |
2021-12-23 | Arkanoid Revenge of Doh sync issue solved. |
Tags:
arcade
bar top
raspberry pi