Double Dragon - JAMMA connector - Part 2
Channel:
Subscribers:
1,700
Published on ● Video Link: https://www.youtube.com/watch?v=iNqOXcjZChI
I still had some issues after replacing the JAMMA harness that turned out to be caused by the adapter board with 5 Volt LED volt meter. Both the original harness and the adapter weren't making good contact.
After replacing them both, everything is now working as it should.
Other Videos By TomsProjects
2022-05-03 | Asteroids Deluxe Cabaret - Part 1 |
2022-05-03 | Asteroids Deluxe Cabaret - Part 2 |
2022-04-19 | Merit Pit Boss Bar Tops - Part 7 - Final |
2022-04-02 | Merit Pit Boss Bar Tops - Part 6 |
2022-04-02 | Merit Pit Boss Bar Tops - Part 5 |
2022-04-02 | Merit Pit Boss Bar Tops - Part 4 |
2022-03-24 | Merit Pit Boss Bar Tops - Part 2 |
2022-03-24 | Merit Pit Boss Bar Tops - Part 3 |
2022-03-17 | Merit Pit Boss Bar Tops - Part 1 |
2022-02-26 | Double Dragon - JAMMA connector - Part 1 |
2022-02-26 | Double Dragon - JAMMA connector - Part 2 |
2022-01-21 | Operation Double Double Dragon - Part 8 - Final! |
2022-01-18 | Operation Double Double Dragon - Part 7 |
2022-01-18 | Operation Double Double Dragon - Part 6 |
2022-01-18 | Operation Double Double Dragon - Part 5 |
2021-12-23 | Arkanoid Revenge of Doh sync issue solved. |
2021-12-21 | Arkanoid Revenge of Doh sync issue? |
2021-12-05 | Operation Double Double Dragon - Part 4 |
2021-11-23 | Operation Double Double Dragon - Part 1 |
2021-11-23 | Operation Double Double Dragon - Part 3 |
2021-11-23 | Operation Double Double Dragon - Part 2 |
Tags:
Taito
Arcade
Double Dragon
JAMMA