Operation Double Double Dragon - Part 7

Channel:
Subscribers:
1,700
Published on ● Video Link: https://www.youtube.com/watch?v=9DS19gMeyA0



Duration: 34:15
29 views
1


I have mounted the Vision Pro monitor chassis to the metal frame, and I made 2 foot wire extensions for the power and signal wires to make sure they don't get pulled out when rotating the monitor.







Tags:
Taito
Double Dragon
Arcade