My N Gauge Japanese Model Railway Layout Phase 2 Part 1
Here is my second video taken from my N gauge Japanese Model Railway Layout that is under construction and this is phase two of the progress. As you may have noticed a lot has changed since the last video was uploaded as there is now a railway station present on the local line and the lower level tracks is now a dual track as intended. The yard is the next thing I am going to work on before I make phase three of the video. Though this video is split into two parts because of the 10 min limit imposed by YouTube, but anyways I hope you all like the progress and I am open to any comments or suggestions that you may have, so please feel free to post them in the comments section below. Once I have completed the trackwork I will then work on the scenery as I think that completing the trackwork is the main priority right now. The only Japanese train that is running in this video for the time being is my Tomix JR 700 Hikari Railstar Shinkansen as I do not have many Japanese trains at present in my fleet so I am using my RENFE AVE S-100 in RENFE "Operadora" livery to fill in for a Nozomi JR 700 Shinkansen that I will be getting sometime this year and the local trains are my Dapol Class 67 Wrexham & Shropshire set which is covering for a JR Series 103 Osaka Loop Line set and the other train is my Mehano Bombardier Blue Tiger in MKB Red & Grey livery hauling a Minitrix SNCF carriage and a Fleischmann OBB carriage and this train is covering for a Series 223 EMU and/or a Kiha 85. I have now named this layout as "Sakai" as it is near Osaka and is based in the Kansai prefecture of Japan. It will look very Japanese once I have completed the scenery and have also included a temple but thats a long way off yet.
Comments & Ratings Welcome!