Robo 3D Printer - Kickstarter/Beta version

Channel:
Subscribers:
1,700
Published on ● Video Link: https://www.youtube.com/watch?v=iGNeihQq-yA



Duration: 11:25
205 views
5


Bought a used 3D printer and didn't get what I thought I was going to get. I can still upgrade the parts to match or exceed the later models but I didn't think I'd have to.

The version I have is the earliest, called the Kickstarter or Beta version. They then came out with the R1, followed by the R1 Plus. Each model had upgrades from the previous model, based on feedback from customers.

I didn't mention what I'm actually printing in the video. They are brackets that snap onto the carriage and hold 40mm fans which cool the plastic. They are for when I upgrade the 'hotend', which is the print head assembly, to the higher quality E3D V6.







Tags:
3d printing