Asteroids Deluxe Cabaret - Part 11

Channel:
Subscribers:
1,700
Published on ● Video Link: https://www.youtube.com/watch?v=lZmbfgJE-R4



Duration: 9:34
27 views
1


The control panel is done and looks great! Not much left to do at this point. The top bracket that holds the tinted plexi in place has been painted and is drying, I should pull the monitor and reflow the input pins, I need to adjust the picture as it's currently too large and then just double check everything.







Tags:
Atari
Asteroids Deluxe
Arcade