JAMMA test rig update

Channel:
Subscribers:
1,700
Published on ● Video Link: https://www.youtube.com/watch?v=bZT_NFftF9A



Duration: 21:14
85 views
3


I started making a JAMMA test rig quite a while ago but never finished it. The past couple days I added a hacked controller and an internal speaker.
This test rig can test JAMMA boards as well as arcade monitors, as it has an isolation transformer mounted inside.

The last thing I'd like to do is figure a way to incorporate a small LCD panel, which I have. I'd like to be able to choose between outputting the video signal to a real arcade CRT or the small panel. This is both a wiring challenge as well as figuring out where to put the LCD when it's being used.