MetiKSP E32 | Assembling The Lupus 0 Station - 'Snowfall' Module | ATS26 Elysium

Subscribers:
638
Published on ● Video Link: https://www.youtube.com/watch?v=S_mkl3dBJJ0



Duration: 14:10
15 views
0


Um um

Telemetries from the Unix was cut several months ago, following the original scheduled launch of its next unit, called 'Snowfall'. Rising concerns come forth in regards to the launch of this module as it is not certain if it will or will not become part of a new presiding space station. To the encroaching media and the strange omen caused by the previous launches, the media is finally exposed to the new Launch Tactique of the ATS space program. Utilizing the second flight of their next generation SSTO - The Elysium. Construction of a new spacestation 'Lupus 0' will begin. The existence of the Lupus 0 will be used both as a staging grounds for future missions and the additional formalities of Tourism and science. The 'Snowfall' Module would be the only remainder of the previous failed Unix station, whoms parts have since been left floating lifelessly in the harsh conditions of sunlight and absolute zero. In an attempt to stop possibilities known from previous missions where fragile station parts such as solar panels would get damaged by the interior walls of the SSTO - a New Strut and Focus system has been created to evenly distribute the workload of the Space component.

Following Internal verifications and the loading of the 7 member crew configuration of the Elysium SSTO. The mission of ATS26 is a go. This time, the Elysium is mounted with more powerful rockets which implies greater versatility during both orbital insertion and eventual post-Earth missions taking crew towards the moon and beyond. In order to demonstrate the perfect safety of the Elysium ship, Media crew were permitted in a risky PR move to station near the launchsite. The launch moves successfuly, as both the inbound cargo and the Ship frame appears to undergo relatively little stress. Upon breaking the Max Q. All communications were cut by a nearby thunderstorm, of which the Elysium's system temporarily decked offline. Contingency tests enabled the Rocket motors to continue their scheduled ascent. Following the small outage, the Elysium would completely switch over to its drone mode, using a subsystem similare to the Enigma and Sigma droneships - which has thus farp proved to be extremely precise. Upon reaching the upper atmosphere - the Elysium would begin it's Station Launch procedure. Following rapid checklists and the opening of the cargo-gates. The first module of the Lupus 0 Space station would be launched. Namely a habitat module named 'Snowfall'. The Snowfall serves as an intermediary crews quarters where most of the Station crew facilities will be located in, alongside accomodations such as food nessesities, toiletries and sleeping quarters. The module 'Snowfall' has no RCS or navigational properties, and thus, it is only a uncontrolled floating device left in lower Earth orbit. Despite warnings from Aeronautic engineers, the Launch was put to a go, with the risk that the second mission towards the 'Lupus 0' Space station would witness an uncontrolled tumble of the 'Snowfall' Incase of it's system failure. Dispatching the Lupus 0 Station, the programmed landing and re-entry would begin. This time, a contingency procedure where the Elysium would perform it's de-orbit turn at the last moment before contact with the upper atmosphere of Earth. Despite the narrow marginals, the Elysium Spacecraft managed to correct itself during pre-entry. Landing safely past at the Union VAB. ||Sorry about the Video Cuttoff ||




Other Videos By Meti Walkthroughs


2016-09-23Yeaaaaaah about my Team uh...
2016-09-23Magikarps say 'die die die'
2016-09-16Blakc Mesa
2016-08-02Metibot v1.0 Q & A Session August 2-11th
2016-08-01Metibot v1.0 | Voicecheck 2
2016-08-01Metibot v1.0 | Demo : He Talks!
2016-07-17Dragon's Hoard v0 41 | A Minecraft 1.8 Mod | First Preview O:
2016-07-14Dragon's Hoard alpha v0.4: Mushroom Hunting Teaser!
2016-07-13cosy cosy~ [Teaser]
2016-07-04MetiKSP E33 | Assembling The Lupus 0 Station - Amber Quartet & EFS Docking Module | ATS27 Elysium
2016-07-03MetiKSP E32 | Assembling The Lupus 0 Station - 'Snowfall' Module | ATS26 Elysium
2016-07-02MetiKSP E31 | ATS25 - Docking Port 'Aedon' & Failure of The Unix Space Station | Enigma Drone
2016-06-10MetiKSP E30 | ATS24 - SeasonChaser - First Commercial Sattelite! and a Memory Time Capsule! | Delphi
2016-05-27MetiKSP E29 | ATS22 - Flight of The Elysium! And The First Spacestation! | Aqueinas Unix
2016-05-27MetiKSP E28 | ATS21 - NorthRope Magnetic Field Clipper | via Antelope Delphi
2016-05-24MetiKSP E27 | ATS20 - ARGOS Long Term Biology Experiment + Return Mission | via SIGMA Drone
2016-05-23MetiKSP E26 | ATS19 - Weather Sattelites WIND & Hurricanos! | via Enigma Drone
2016-05-22MetiKSP E25 | ATS18 - AQVI Oceanography Sattelite | via Antelope Canis
2016-05-22MetiKSP E24 | ATS17 - The New Featherwing | carrying BEPPO Albedo and Global Warming Monitor
2016-05-21MetiKSP E23 | ATS16 - Techtonic Structure & Dynamics | via Antelope Delphi
2016-05-21MetiKSP E22 | ATS15 - Final Flight of Theta | MONOchem via Antelope Theta



Tags:
Sandbox
Kerbal
Space
Program
Ksp
KerbalSpaceProgram
Kerbal Space Program
playthrough
Letsplay
Let's Play
space game
sandbox
roleplay



Other Statistics

Kerbal Space Program Statistics For Meti Walkthroughs

Currently, Meti Walkthroughs has 1,359 views for Kerbal Space Program across 48 videos. The game makes up 16 hours of published video on his channel, roughly 2.79% of Kerbal Space Program content that Meti Walkthroughs has uploaded to YouTube.