Model Railway 08 The Table Is Ready
Channel:
Subscribers:
18,400
Published on ● Video Link: https://www.youtube.com/watch?v=aoeTd0DnVCw
The woodwork for the table is finished. The bridge that can be opened at the door entrance of the room has been mounted on two hinges and it closes with a siding lock. The two ramps are height adjusted to the mm. One has a 2% inclination, the other 3%, which should drive OK. Let the track laying begin!