
Operation Double Double Dragon - Part 4
One Double Dragon cabinet is now working!
The G07 monitor wasn't working when I got the cabinet, so I installed a cap kit, replaced the flyback, HOT, and a few other components that are recommended when doing the flyback and caps.
Unfortunately the second Double Dragon cabinet still has a dead monitor. I have tried a few things and tested several components. I'm not sure if I'll bother doing anymore troubleshooting since I plan on replacing it with a tri res Vision Pro monitor.
I also go over some more information about Double Dragon cabinets, like the wire connectors they use, the way the punch, jump and kick buttons are wired right to left instead of JAMMA standard left to right and also why there are black bars on the sides of the game video.
Other Videos By TomsProjects
Other Statistics
Double Dragon Statistics For TomsProjects
There are 148 views in 3 videos for Double Dragon. The game makes up 1 hour of published video on his channel, or 1.35% of the total watchable video for Double Dragon on TomsProjects's YouTube channel.