
Operation Double Double Dragon - Part 1
Channel:
Subscribers:
1,700
Published on ● Video Link: https://www.youtube.com/watch?v=sBiS6ExCTSI
Big thanks to my friend Gary for the Double Dragon cabs! I sold my 25" 'War Final Assault' cabinet and will be replacing it with one of these cabs.
One of the cool things about Taito Double Dragon cabs is that they have a drawer in the front that contains the JAMMA harness and power supply, along with an easy to rotate monitor. Perfect for use with any PCB that follows the JAMMA standard of 2 joysticks and 3 buttons (or less).
Other Videos By TomsProjects
Tags:
Arcade
Double Dragon
Other Statistics
Double Dragon Statistics For TomsProjects
There are 148 views in 3 videos for Double Dragon. The game makes up 1 hour of published video on his channel, or 1.35% of the total watchable video for Double Dragon on TomsProjects's YouTube channel.