Tsunami MEGA arcade project - Part 3
Channel:
Subscribers:
1,700
Published on ● Video Link: https://www.youtube.com/watch?v=dI9vIpnYxHg
The cabinet that the Tsunami Mega arcade is in was originally a 'War Final Assault'. I've always liked the artwork on those cabinets so I decided to try and strip off the black paint.
So far it's going well, although slow. I'm using 'Citris Strip' paint stripper applied with cheap paint brushes in small sections at a time. It's taking 2 coats applied for 5 minutes each, then a plastic scraper is used to remove the paint.
There is still residue left after that, so I take paper towels with either more stripper or some isopropyl alcohol to take off the last of the paint. It's looking good so far but it's going to take a while.
Other Videos By TomsProjects
2020-02-24 | Tsunami MEGA arcade project - Part 5 - Working!!! |
2020-01-16 | Two 3D printers at the same time. |
2020-01-15 | Tevo Tornado first print. |
2019-12-26 | Tsunami MEGA arcade project - Part 4 |
2019-10-24 | Elite Dangerous: PVE combat with TrackIR |
2019-10-15 | Elite Dangerous: Mining with Nick using External Camera |
2019-09-25 | Mining With Nick |
2019-09-25 | Mining with TrackIR - Part 2 |
2019-09-25 | Mining with TrackIR - Part 1 |
2019-09-11 | Carnevil arcade pedestal to Naomi gun cabinet - Sad Final Video |
2019-05-07 | Tsunami MEGA arcade project - Part 3 |
2019-05-07 | Tsunami MEGA arcade project - Part 2 |
2019-04-25 | Tsunami MEGA arcade project - Part 1 |
2018-12-20 | Elite Dangerous: 3 3 1 bug2 |
2018-12-20 | Elite Dangerous: 3 3 1 bug1 |
2018-10-01 | Carnevil arcade pedestal to Naomi gun cabinet part 12 |
2018-09-13 | Omega Race - Part 7 - Final! |
2018-09-11 | Omega Race - Part 6 |
2018-08-16 | Omega Race - Part 5 |
2018-08-16 | IGT Five Times Pay Double Spin slot machine |
2018-08-13 | Omega Race - Part 4 |
Tags:
arcade