Tevo Tornado first print.

Tevo Tornado first print.

Channel:
Subscribers:
1,700
Published on ● Video Link: https://www.youtube.com/watch?v=1hJXCVAk6Eo



Duration: 7:39
218 views
1


The first, ok second, print on my Tevo Tornado 3D printer. The first and second were calibration cubes. The first failed about 1/4 of the way through due to the bed being a bit too low, so the cube became detached from the bed.

My second attempt printed OK, although it's about 20.2mm on the X and Y axis rather than 20. I should be able to correct that fairly easily.