Sega Naomi Netboot with WiPi - Part 7

Channel:
Subscribers:
1,700
Published on ● Video Link: https://www.youtube.com/watch?v=XDCbd4RZIAQ



Duration: 23:53
119 views
4


Success! Everything is plugged in and inside the PC case, and working!

I've got a wire management problem at the moment but I've got a shorter VGA cable and HDMI cable on the way to help with that. I've also got a piece of metal from the top of the case that I need to cut an opening in for an HDMI connector. I'm not sure where I'll put the VGA to HDMI adapter inside, maybe in the bottom of the case.

I played for a bit after the video and didn't have the problem where the first button stuck. I think there was some dirt or a bit of debris from my workbench that might have been causing the button to stick when I first tried it.







Tags:
Sega Naomi
arcade