Sega Naomi Netboot with WiPi - Part 3
I've made an adapter harness to replace the SUN brand power supply with an ATX power supply. I've made an adapter to replace the wall plug that powers the Raspberry Pi with a cable that goes from a PC Molex power plug to a micro USB plug. I've made an adapter to replace the wall plug that powers the VGA to HDMI converter with a cable that goes from a PC Molex power plug to a barrel connector. Lastly, I moved the wires that powered the compact flash reader over to power the JVS I/O board.
I've ordered an 'Undamned USB Decoder' board that will allow me to plug a 'fightstick' made for PlayStation or Xbox console into it and then it will output the correct joystick or button press into the JVS I/O board.
The only hitch so far was the barrel power connector going into the VGA to HDMI converter. The inside diameter of the connector was a bit too large which caused the power to cut in and out. Luckily I had another barrel connector that had the correct inside diameter, so that is already fixed.
Other Videos By TomsProjects
2021-12-05 | Operation Double Double Dragon - Part 4 |
2021-11-23 | Operation Double Double Dragon - Part 1 |
2021-11-23 | Operation Double Double Dragon - Part 3 |
2021-11-23 | Operation Double Double Dragon - Part 2 |
2021-11-04 | Sega Naomi Netboot with WiPi - Part 9 |
2021-11-02 | Sega Naomi Netboot with WiPi - Part 8 |
2021-10-26 | Sega Naomi Netboot with WiPi - Part 7 |
2021-10-26 | Sega Naomi Netboot with WiPi - Part 6 |
2021-10-20 | Sega Naomi Netboot with WiPi - Part 5 |
2021-10-20 | Sega Naomi Netboot with WiPi - Part 4 |
2021-10-12 | Sega Naomi Netboot with WiPi - Part 3 |
2021-10-07 | Sega Naomi Netboot with WiPi - Part 2 |
2021-10-07 | Sega Naomi Netboot with WiPi - Part 1 |
2021-10-06 | 3D Printed R2D2 - Part 67 |
2021-10-01 | 3D Printed R2D2 - Part 66 |
2021-09-23 | 3D Printed R2D2 - Part 65 |
2021-09-18 | 3D Printed R2D2 - Part 64 |
2021-09-14 | 3D Printed R2D2 - Part 63 |
2021-09-07 | 3D Printed R2D2 - Part 62 |
2021-09-07 | 3D Printed R2D2 - Part 61 |
2021-08-31 | 3D Printed R2D2 - Part 59 |