3D Printer Voron 2.4 Rev. C 350mm - Build Progress Part 7

Channel:
Subscribers:
1,700
Published on ● Video Link: https://www.youtube.com/watch?v=h-aRNZCLqsk



Duration: 4:53
1,350 views
11


The A and B belts are now on, so the carbon fiber gantry is done, kind of. The gantry uses a microswitch on the tool head for the X limit and another on the back of the gantry for the Y limit. This clashes with the LDO kit, which uses a small PCB that has both the X and Y switches mounted on it.

I'll need to figure out how I'll set that up, along with the wires coming off the tool head once I get to that stage.







Tags:
3D Printing
Voron 2.4