3D Printer Voron 2.4 Rev. C 350mm - Build Progress Part 12

Channel:
Subscribers:
1,700
Published on ● Video Link: https://www.youtube.com/watch?v=X85iIIQKT0c



Duration: 15:36
587 views
13


Finally, some actual progress! First power on with all boards and wiring connected, except the tool head, was successful.
I then started loading the firmware onto the Raspberry Pi and Octopus board following a video from 'Build It Basement'.

Build It Basement video on installing Klipper for Voron 2.4:
https://youtu.be/O_5F9NnVSmM?si=0JkQN6QSlrB4RtDw

The only thing I encountered that was different from the above video was that I only had the 64bit version of Mainsail showing in the Raspberry Pi Installer, so that's the one I used.

I also had an issue getting the PuTTY software to connect to the Raspberry Pi. I was getting a 'Key Exchange Algorithm Agreement' error when trying to login to the Pi. I had seen this before while working on another project, and remembered that the fix was to update PuTTY. It turned out that the version of PuTTY I had installed was several years old, and installing a new version did fix the issue.

As shown in the video, the screen was upside down on initial boot. Voron notes that this might happen, and has the steps needed to reverse the image here:
https://docs.ldomotors.com/en/guides/btt_43_rotate_guide


I still need to do some configuration for the Chaotic Lab Tap v2 Z height modification before plugging in the tool head wiring loom. Once I get the printer up and running, I'll probably be switching over to CANBUS or USB to reduce the wires from the tool head.







Tags:
3D Printing
Voron 2.4